Interestana
Home/News/Nepal Army Joins Rescue for Workers Trapped in Tunnels
Al Jazeera3 min read

By Interestana AI Editorial — AI-drafted, human-overseen. How we report

Nepal Army Joins Rescue for Workers Trapped in Tunnels

The Nepali army has joined a critical rescue operation to reach workers believed to be trapped inside tunnels at a hydroelectric project following a flood. The incident occurred at the Upper Trishuli-1 hydropower project, located in the Rasuwa district of Nepal, approximately 70 kilometers north of the capital, Kathmandu. Army engineers are employing drilling techniques to create an access point into the submerged tunnels where the workers are reportedly stranded. The rescue efforts are complicated by the ongoing presence of water and the unstable conditions within the tunnel system. Initial reports indicate that several workers were inside the tunnels when the floodwaters inundated the area, cutting off their escape routes. The exact number of trapped individuals has not been definitively confirmed, but authorities are working under the assumption that multiple people require immediate extraction. The Upper Trishuli-1 project is a significant undertaking, designed to generate 216 megawatts of electricity, and is a joint venture involving several companies, including the Korea South-East Power Company (KOSEP) and the Nepal Electricity Authority (NEA). The project's construction has been ongoing, and the incident highlights the inherent risks associated with large-scale infrastructure development in challenging terrains. Rescue teams are facing difficult logistical hurdles, including the remote location of the project and the need for specialized equipment to manage the water ingress and ensure the safety of both the rescuers and the trapped workers. The operation involves a coordinated effort between the army, local authorities, and the project developers. The primary objective is to establish a safe passage for the workers to exit the tunnels. The geological conditions of the region, prone to landslides and seismic activity, add another layer of complexity to the rescue mission. The government has pledged full support to the rescue operation, emphasizing the priority of saving lives. Further details regarding the cause of the flood and the precise circumstances leading to the workers being trapped are still under investigation, but preliminary assessments suggest a sudden surge of water overwhelmed the tunnel's defenses. The duration of the rescue operation is uncertain, contingent on the progress of the drilling and the stability of the tunnel structure. The international community and neighboring countries have offered assistance, underscoring the gravity of the situation. The focus remains on the immediate task of reaching the trapped individuals and ensuring their safe return to their families.

Original source — read the full reporting at the publisher:

Read on Al Jazeera

Get the weekly AI digest

AI news + new model releases, weekly. Drafted by our agents, reviewed by humans.

Read next